Reach on Infrastructure Innovative TOT Integrated Financing Mode Framework

Volume 4, Issue 5, October 2019     |     PP. 137-147      |     PDF (499 K)    |     Pub. Date: August 19, 2019
DOI:    214 Downloads     6177 Views  

Author(s)

Wang Hui, Yunnan Normal University, Kunming 650500, China

Abstract
Infrastructure projects are always in a changing environment and are full of risks.In view of the shortcomings of the current single TOT financing model and the failure of the project, this paper proposes an innovative TOT integrated financing model from the perspective of comprehensive integration, aiming to strengthen its ability to adapt to environmental changes and to cope with risks, Which will contribute to the success of the project.Through in-depth discussion on the theoretical basis and practical cases of the TOT model, the paper clarifies the necessity and feasibility of the research, and finally proposes the theoretical framework and operational mechanism of the innovative TOT integrated financing model.

Keywords
Infrastructure; Innovative TOT Integrated Financing Mode; framework;operational mechanism

Cite this paper
Wang Hui, Reach on Infrastructure Innovative TOT Integrated Financing Mode Framework , SCIREA Journal of Clinical Medicine. Volume 4, Issue 5, October 2019 | PP. 137-147.

References

[ 1 ] Miao Dongsheng.Systematic science essentials[M].Beijing:China Renmin University Press.2010
[ 2 ] Wang Songjiang,Yin Mingyan.Operational public infrastructure integrated financing management[M].Beijing:Science Press.2012
[ 3 ] Lu Xiaqin.Research on BOT-BT-TOT Integrated Financing Mode Operation System[D].Kunming University of Science and Technology.2011
[ 4 ] Zhang Yueqing, Wu Qingling.Urban infrastructure operation and management[M]. Beijing:Economic science press.2005
[ 5 ] Richard Burke, Istemi Demirag.Risk transfer and stakeholder [6]relationships in Public Private Partnerships[J].Accounting Forum,2017
[ 6 ] Lina María Sastoque, Carlos Alejandro Arboleda, Jose Luis Ponz.A Proposal for risk Allocation in social infrastructure projects applying PPP in Colombia[J].Procedia Engineering,2016
[ 7 ] Muhammad Saiful Islam a, Madhav Prasad Nepal a, Martin Skitmore a,b, Meghdad Attarzadeh c.Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects[J].Advanced Engineering Informatics,2017
[ 8 ] Asheem Shrestha, PhD. , Toong-Khuan Chan, PhD. , Ajibade A. Aibinu, PhD.Chuan Chen, PhD. Efficient risk transfer in PPP wastewater treatment projectsPPP[J].Utilities Policy,2017
[ 9 ] Cinzia Muriana,Giovanni Vizzini.Project risk management: A deterministic quantitative technique for assessment and mitigation[J]. International Journal of Project Management,2017
[ 10 ] Kon Shing Kenneth Chung, Lynn Crawford.The role of social networks theory and methodology for project stakeholder management[J]. Procedia - Social and Behavioral Sciences, 2016